Metals & Fabrication Recruiters
Manufacturing Headhunters recruits manufacturing professionals nationwide.
This is what we do all day: recruit manufacturing professionals.
No postings. No stacks of resumes. No chasing. You interview a short list.
No upfront fee. You pay only if you hire.
Need someone now? Call 305-306-4829.
Fabrication leaders who can run laser, brake, weld and finish as one flow. No upfront fee. You pay only if you hire.
No upfront fee. You pay only if you hire. We offer a candidate replacement guarantee on standard search agreements. The applicable period and exact terms are set out in the signed client recruiting agreement.
- No upfront fee
- Pay only if you hire
- Manufacturing only
- We reach people who aren't on job boards
- Replacement guarantee on standard searches
What should you know about sub-sectors and processes we know?
A fabrication shop turns flat sheet, plate, tube and structural shapes into welded and finished assemblies, usually in high mix and under tight promise dates. Cutting, forming, welding, finishing and sometimes coating all have to arrive at the next station in order.
foundries, forging, stamping, CNC machining, structural and sheet metal fabrication, steel service centers, mills
Process depth (stamping, machining, casting, forging, heat treat, welding); AWS and ASME codes; CQI-9/11/12/15; skilled trades shortage
Why fit is difficult
A fabrication shop turns flat sheet, plate, tube and structural shapes into welded and finished assemblies, usually in high mix and under tight promise dates. Cutting, forming, welding, finishing and sometimes coating all have to arrive at the next station in order. Leaders constantly trade labor, machine capacity and customer commitments. The hardest part is often the welding workforce, because the work depends on trained hands and a shop that cannot keep them is always short.
Responsibilities behind the title
We read for the process mix: laser, plasma and waterjet cutting, press brakes, robotic and manual welding, finishing and assembly. A leader from a robotic welding line of repeat parts may struggle in a one-off structural shop, and the reverse is also true. Product weight matters. Light gauge enclosures, heavy plate weldments and tube assemblies each demand different handling, fixtures and inspection. Scheduling discipline and customer communication transfer better than technical skill.
Qualification in practice
We ask for the size of the shop, headcount by area, equipment list and the products built. We ask which weld codes and procedures the shop worked under, who owned welder qualification, and how rework was tracked. For production leaders we ask how orders were scheduled, how bottlenecks were found and what percentage of orders shipped on promise, described in their own terms.
Welding leadership is its own skill
A welding supervisor or manager must understand procedures, qualified welders, filler materials, fit up and distortion. Where work follows codes such as AWS structural rules or ASME for pressure items, records of procedures and welder qualification matter. We do not interpret codes for clients. We ask the candidate how welders were trained, how continuity was kept and how rework was reduced. A leader who built a pipeline of trainees often describes a different shop from one who relied only on hiring experienced welders.
Scheduling a high mix shop
In a fab shop the schedule changes daily as material shows up late, a laser goes down or a customer pulls a date in. Production planners and managers need to see downstream constraints, usually the brake or the weld cells, and protect them. Strong candidates describe how they sequence orders, how they communicate changes to customers and how they stop expediting from consuming the floor. Weak ones describe heroics. We probe the system behind the story.
Automation and the engineering bridge
Many shops have added fiber lasers, automated sheet handling, press brake robots and welding cobots. The manufacturing engineer who can program, justify and implement this equipment connects the quoting team to the floor. Candidates should explain nesting, tooling, fixture design and how new equipment was staffed. We separate those who purchased equipment from those who made it productive, since utilization is where the return shows up. Search calibration usually turns on whether the shop needs a builder of cells or an optimizer of an existing flow.
Finishing, coating and the last bottleneck
Parts that are cut, formed and welded still have to be cleaned, ground, painted, powder coated or plated before shipment, and finishing is a frequent hidden bottleneck. Some shops run their own paint lines, others outsource and lose control of lead time. Leaders should be able to explain the choice and its consequences for delivery and cost. We ask how finishing was scheduled relative to welding, how rack or fixture limits were handled and how defects such as coating thickness or surface appearance were controlled. Candidates who understand the entire flow, from raw material to crate, tend to find constraints the department managers cannot see. That perspective is what we look for in a plant or operations manager.
Craft skills and assignment boundaries
For fabrication leadership, union experience can shape welding assignments, training and overtime coverage. We ask how the candidate matched qualified people to the work while respecting the applicable agreement. A supervisor from a flexible nonunion shop must not assume the same staffing discretion exists in your facility.
What should you know about roles we fill in Metals & Fabrication?
Executive & General Management
- CEO / President (Manufacturing)
- Chief Operating Officer (COO)
- VP of Operations
- VP of Manufacturing
- Regional VP of Operations
- General Manager (Manufacturing)
- Director of Operations
- EVP / SVP Operations
- Division / Business Unit General Manager
- Director of Manufacturing
- Integration / Transformation Leader
- Senior Director of Operations
Plant & Production Management
- Plant Manager
- Plant Director / Site Director
- Assistant Plant Manager
- Operations Manager
- Manufacturing Manager
- Production Manager
- Production Supervisor
- Shift Manager (2nd / 3rd shift)
- Plant Startup / Launch Manager
- Plant HR Manager
- Production Superintendent
- Area Manager
- Value Stream Manager
- Department Manager
- Shift Supervisor
- Packaging Supervisor
- Production Team Lead
- Sanitation Supervisor
- Bilingual Production Supervisor
- Second Shift Production Supervisor
- Third Shift Production Supervisor
Manufacturing, Process & Industrial Engineering
- Manufacturing Engineering Manager
- Manufacturing Engineer
- Process Engineer
- Process Engineering Manager
- Industrial Engineer
- Tooling Engineer
- Welding Engineer
- NPI Engineer
- Plant Engineer
- Project Engineer / Capital Projects Manager
- Materials Engineer
- Metallurgist / Metallurgical Engineer
- Director of Manufacturing Engineering
- Senior Manufacturing Engineer
- Senior Process Engineer
- Packaging Development Engineer
- Mold / Die Design Engineer
- NPI Manager
- Plant Engineering Manager
- Capital Projects Manager
- Polymer / Plastics Engineer
- Process Development Engineer
- Tech Transfer Engineer
- Test Engineer
- Lead Manufacturing Engineer
- Senior Industrial Engineer
- Senior Packaging Engineer
Automation, Controls & Electrical
- Controls Engineer
- Automation Engineer
- PLC Programmer
- Robotics Engineer
- MES Engineer
- Electrical Engineer (Plant)
- Controls / Automation Manager
- Director of Automation
- Automation Manager
- Senior Controls Engineer
- SCADA / HMI Engineer
- Manufacturing Systems / OT Engineer
- Lead Controls Technician
- Panel Design Engineer (UL 508A)
- Lead Controls Engineer
- Controls Supervisor
Product Design, R&D & Program Management
- VP of Engineering
- Director of R&D
- Mechanical Design Engineer
- Product Development Engineer
- Electrical Design Engineer
- Program Manager
- Chief Technology Officer (CTO)
- R&D Manager
- R&D Engineer
- Mechanical Engineer
- Product Design Engineer
- Product Engineer
- Firmware / Embedded Engineer
- Systems Engineer
- CAD Designer / Drafter
- Product Development Scientist
- Engineering Manager (Product)
- Senior Mechanical Design Engineer
- Lead Product Development Engineer
Quality, Food Safety & Regulatory
- VP of Quality / Chief Quality Officer
- Director of Quality
- Quality Manager
- QC Manager
- Quality Engineer
- Supplier Quality Engineer
- Supplier Quality Manager
- Quality Systems Manager
- QA Manager
- QC Lab Manager
- Senior Quality Engineer
- Quality Engineering Manager
- Quality Systems Engineer / Specialist
- Validation / CQV Manager
- Quality Auditor / Lead Auditor
- CAPA Manager
- Document Control Manager
- Metrology / Calibration Manager
- QC Microbiology Manager
- Regulatory Compliance Manager
- Lead Quality Engineer
- Quality Supervisor
Maintenance, Reliability & Facilities
- Maintenance Manager
- Director of Maintenance
- Maintenance Supervisor
- Maintenance Planner / Scheduler
- Reliability Engineer
- Reliability Manager
- Facilities Manager
- Maintenance & Engineering Manager
- Maintenance Engineer
- Asset Management / CMMS Manager
- Facilities Engineer
- Utilities / Energy Manager
- Tool Room Manager
- Lead Maintenance Technician
- Senior Reliability Engineer
- Lead Reliability Engineer
EHS & Sustainability
- EHS Manager
- EHS Director
- Safety Manager
- Environmental Manager
- Safety Specialist / Coordinator
- Environmental Engineer
- Industrial Hygienist
- Sustainability Manager / Director
- EHS Engineer
- Environmental Permitting Specialist
- Senior EHS Manager
- EHS Coordinator
Continuous Improvement & Operational Excellence
- Continuous Improvement Manager
- Continuous Improvement Engineer
- Lean Six Sigma Black Belt
- Director of Operational Excellence
- Lean Manager
- VP of Operational Excellence
- Director of Continuous Improvement
- Lean Specialist / Coordinator
- Master Black Belt
- TPM Manager / Coordinator
- Senior Continuous Improvement Engineer
- Lead Continuous Improvement Engineer
Supply Chain, Procurement & Planning
- VP of Supply Chain / Director of Supply Chain
- Supply Chain Manager
- Purchasing Manager
- Strategic Sourcing Manager
- Supplier Development Engineer
- Materials Manager
- Production Planner / Master Scheduler
- S&OP Manager
- Procurement Manager
- Chief Supply Chain Officer
- Director of Procurement
- Commodity Manager
- Category Manager (Direct Materials)
- Buyer / Senior Buyer
- Supplier Development Manager
- Director of Planning
- Demand Planner
- Supply Planner
- Production Scheduler
- Inventory Control Manager
- Senior Production Planner
- Senior Buyer
Logistics, Distribution & Warehouse
- Logistics Manager
- Warehouse Manager / Distribution Center Manager
- Director of Logistics
- Transportation Manager
- Warehouse Supervisor
- Shipping & Receiving Manager
- Material Flow / Logistics Engineer
- Logistics Supervisor
Technical Sales, Applications & Field Service
- VP of Sales (Industrial)
- Regional Sales Manager / Technical Sales Manager
- Sales Engineer
- Applications Engineer
- Director of Sales
- National Sales Manager
- Inside Sales Engineer
- Applications Engineering Manager
- Key Account Manager
- National Account Manager
- Business Development Manager
- Territory Sales Manager
- Channel / Distributor Sales Manager
- Product Manager (Industrial)
- Field Service Manager
- Proposal / Quotation Engineer
- Senior Applications Engineer
- Lead Field Service Engineer
- Traveling Field Service Engineer
Manufacturing Finance & Accounting
- CFO (Manufacturing)
- Corporate Controller
- Plant Controller
- Cost Accountant
- VP of Finance
- Division Controller
- Assistant Plant Controller
- Cost Accounting Manager
- Senior Cost Analyst
- Inventory Accountant
- FP&A Manager (Operations)
- Senior Plant Controller
- Senior Cost Accountant
Machining & Toolroom
- CNC Machinist
- CNC Setup Machinist
- CNC Programmer
- 5-Axis CNC Machinist
- Swiss CNC Machinist
- Tool and Die Maker
- Mold Maker
- CNC Machine Operator
- Horizontal Boring Mill (HBM) Machinist
- Manual Machinist
- EDM Machinist (Wire and Sinker)
- CNC Grinder / Precision Grinder
- Lead Machinist
- Machinist A
- Machinist B
- Machinist C
- Senior CNC Machinist
- CNC Machining Supervisor
Welding, Fabrication & Metal Finishing
- Production Welder (MIG)
- TIG Welder
- Code Welder (ASME / Pressure Vessel)
- Robotic Welding Technician
- Press Brake Operator
- Die Setter (Stamping)
- Welder-Fabricator
- Fitter / Layout Fitter
- Sheet Metal Fabricator
- Laser / Plasma / Waterjet Cutting Operator
- Heat Treat Technician
- Plating / Anodizing Technician
- Industrial Painter / Powder Coat Technician
- Foundry Molder / Melt Operator
- Welding Supervisor
- Lead Welder
Industrial Maintenance & Plant Technicians
- Industrial Maintenance Technician
- Industrial Electrician
- Electromechanical / Mechatronics Technician
- Millwright
- PLC / Controls Technician
- Robotics Technician
- Instrumentation & Electrical (I&E) Technician
- Industrial Refrigeration (Ammonia) Technician
- Maintenance Mechanic
- Multi-Craft Maintenance Technician
- Hydraulic / Fluid Power Technician
- Boiler Operator / Stationary Engineer (Plant Utilities)
- Predictive Maintenance (PdM) Technician
- Forklift / Material Handling Equipment Technician
- Maintenance Technician A
- Maintenance Technician B
- Maintenance Technician C
- Traveling Millwright
Production Operators, Setup & Line Leads
- Production Technician
- Setup Technician
- Line Lead
- Skilled Machine Operator
- Utility / Relief Operator
- Production Trainer (OJT Trainer)
- Senior Production Technician
- Lead Production Technician
Quality Inspection, Metrology & Lab Technicians
- Quality Inspector
- Quality Technician
- CMM Programmer
- Calibration Technician
- Certified Welding Inspector (CWI)
- NDT Technician
- QC Lab Technician
- Food Safety / QA Technician
- First Article Inspector
- Receiving / Source Inspector
- Metrology Technician
- Microbiology Lab Technician
- Environmental Monitoring Technician
- Lead Quality Inspector
- Senior CMM Programmer
Warehouse, Materials & Shipping
Ready to start? Tell us the seat.
Where the right experience comes from?
Candidates work in contract job shops, OEM fabrication operations, heavy equipment suppliers, enclosure makers and structural steel or pressure vessel shops. Job shop leaders are strong in quoting, flexibility and scheduling. OEM fabricators are strong in repeatability, takt and engineering change control. Pressure vessel and structural leaders may carry code related quality expertise that general fabricators lack.
- Plant Manager, Metals & Fabrication
- Industrial Electrician, Metals & Fabrication
- Production Supervisor, Metals & Fabrication
- Process Engineer, Metals & Fabrication
- Maintenance Manager, Metals & Fabrication
- Reliability Engineer, Metals & Fabrication
- EHS Manager, Metals & Fabrication
- Tool and Die Maker, Metals & Fabrication
- Production Welder (MIG), Metals & Fabrication
- Industrial Maintenance Technician, Metals & Fabrication
- Quality Inspector, Metals & Fabrication
How this manufacturing search runs?
- Define the operating brief and agree the recruiting terms in writing.
- Map comparable working talent and approach people directly.
- Screen against the plant, explain concerns and arrange focused interviews.
- Resolve offer, location and start arrangements with the hiring team.
Ready to start? Tell us the seat.
What should you know about questions about Metals & Fabrication searches?
Do you recruit welding supervisors?
Yes: We look for leaders who have developed welders and handled procedures and rework, not only supervised a crew.
Can a job shop leader move to an OEM fabricator?
Often yes for flexibility, but repeatability and change control may need support. We discuss the gap with the owner.
Do you cover laser and automation roles?
Yes, including manufacturing engineers and programmers responsible for nesting and robotic cells.
Which quality systems do you screen for?
ISO 9001 is common, and some shops need code related experience. We ask what the shop actually operated under.
Do you recruit schedulers and planners?
Yes: In high mix shops a strong planner can matter as much as a manager.
What replacement guarantee applies?
We offer a candidate replacement guarantee on standard search agreements. The applicable period and exact terms are set out in the signed client recruiting agreement.
What should you know about start your Metals & Fabrication search?
Ready to start? Tell us the seat.
What should you know about related sectors?
The Six-Step Search
What do you get before interviewing?
1. Search CalibrationYou get a hiring brief that separates the work, reporting authority and non-negotiable requirements. We agree what would make a candidate worth an interview before contacting anyone. 2. Market MappingYou get a defined search pool, not a reposted vacancy.
1. Search Calibration
You get a hiring brief that separates the work, reporting authority and non-negotiable requirements. We agree what would make a candidate worth an interview before contacting anyone.
2. Market Mapping
You get a defined search pool, not a reposted vacancy. We identify the kinds of plants and teams where people already handle comparable equipment, processes and operating demands.
3. Professional Contact Intelligence
You get a way to reach working people directly. We check professional contact routes and approach candidates discreetly, without making your plant or vacancy public unless you approve.
4. Persistent Personalized Outreach
You get individual conversations about the actual opening. We explain the work, shift and location, ask whether a move makes sense, and follow up without pretending every person is interested.
5. Live Candidate Qualification
You get evidence of fit before spending interview time. We talk through decisions, equipment, results and reasons for moving, then distinguish direct experience from skills that would need support.
6. Candidate Intelligence and Process Support
You get a focused short list with the information behind it. We explain motivation, practical constraints and concerns, support interviews, and keep offer decisions with your hiring team.
Ready to start? Tell us the seat.
What should we discuss first?
A fabrication shop turns flat sheet, plate, tube and structural shapes into welded and finished assemblies, usually in high mix and under tight promise dates. Cutting, forming, welding, finishing and sometimes coating all have to arrive at the next station in order.
What should we settle first about Metals & Fabrication?
A fabrication shop turns flat sheet, plate, tube and structural shapes into welded and finished assemblies, usually in high mix and under tight promise dates. Cutting, forming, welding, finishing and sometimes coating all have to arrive at the next station in order. Leaders constantly trade labor, machine capacity and customer commitments. The hardest part is often the welding workforce, because the work depends on trained hands and a shop that cannot keep them is always short.
What should you know before sending metals & fabrication?
When do you pay a recruiting fee?
No upfront fee. You pay only if you hire. The signed recruiting agreement sets the fee basis and payment terms. Sending an opening does not itself commit you to a fee or an exclusive arrangement.
How long does it take to see a short list?
We discuss the search conditions before describing a realistic next step. Shift, location, equipment match and the candidate's reasons for moving all matter. We do not promise a shortlist date before understanding the opening.
How do you handle counteroffers?
We ask what is driving the move before introducing a candidate. We discuss what might change if the current employer offers more money or a different job. Your team still decides whether that person's motivation fits the opening.
What replacement terms apply?
We offer a candidate replacement guarantee on standard search agreements. The applicable period and exact terms are set out in the signed client recruiting agreement.
What do you not do?
We do not bill hourly for a standard permanent search, repost a job-board ad as a search, or supply high-volume general labor. Retainers are not the default. Any different arrangement must be agreed in writing.
Read the contingency fee terms · Review Metals & Fabrication